Power

KMIC has developed an electricity plan to ensure a highly stable power supply and minimize power cuts. Demand and supply were carefully calculated according to land usage and the future plans of the Myanmar Ministry of Electricity and Energy (MOEE). Using distribution lines with reinforced concrete poles, power will be drawn from national grid transmission lines to the north and connected to an onsite substation with a capacity of 100 MW.